- Home
- Government
- Departments
- Public Works
- Harford Streams
- Restoration Projects
- Active Projects
- Farnandis Branch at Woodland Restoration Project
Harford Streams
Green Choices. Healthy Streams.
Farnandis Branch at Woodland Restoration Project
Expected construction start spring 2021, completion fall 2021
The purpose of the project is to improve stream health by stabilizing eroding stream banks, providing additional area for flow during rain storms, and protecting an existing sewer line.
Pre-construction pictures
Project design sketch
The following sketches were created to provide property owners with a better understanding of the proposed design. The vertical red lines below correspond to the red lines above (limit of disturbance). While tree removal with this design is aggressive, it is necessary to provide the additional space for the stream to overtop its banks and spread into the floodplain. This design will provide long-term stability for the stream, protection of the sewer line and improvements to the overall health of the stream.
Project design (30% complete)
The following engineered design represents the proposed plans as shown graphically in the sketch above. This design only includes a portion of the details necessary to construct the restoration.
Frequently Asked Questions